Parts on time. Time after time.

Leasing Companies

Volant provides turn-key solutions for a wide variety of interior reconfigurations. Below are just a few of the projects we have completed:

  • Sumisho Aircraft Asset Management B737-500 1 A/C
    Project engineering, parts kits and certification to reconfigure aircraft from 113Y to 132Y by removing the G2 and G7 galleys and installing the associated bins, ceilings & sidewalls.
  • CIT Aerospace B737-400 1 A/C
    Project engineering, supplied, manufactured, procured & modified FAA certified reconfiguration kits including: class dividers, spacer panels, EEPL, placards, support structure, etc. to adjust passenger capacity from 170Y to 12F/138Y. Provided engineering order, LOPA, emergency equipment drawing and FAA form 8110-3 certification.
  • SUNROCK B767-300 1 A/C
    Supplied, manufactured, procured & modified FAA certified reconfiguration kits including: stowage bins, ceiling panels, sidewall panels, PSUs & spacer panels, support structure, etc. to increase passenger capacity and services from 227/Y to 18B/258Y.
  • CIT Aerospace B737-300 3 A/C
    Project engineering, supplied, manufactured, procured seats, curtain & header installations, PSUs & spacer panels, etc. Provided engineering order, LOPA, emergency equipment drawing and FAA form 8110-3 certification.
  • Safair MD-80 4 A/C
    Supplied, manufactured, procured & modified reconfiguration kits including: galleys, stowage bins, PSUs & spacer panels, sidewall panels, ceiling panels, support structure, etc.
  • CIT Aerospace B737-300 1 A/C
    Project engineering, supplied, manufactured, procured & modified FAA certified reconfiguration kit to reconfigure from a two class configuration to all economy and replace existing KSSU galleys with Atlas galleys. Provided engineering order, LOPA, emergency equipment drawing and FAA form 8110-3 certification.
  • ICON Capital B737-400 1 A/C
    Project engineering, supplied, manufactured, overhauled and procured FAA certified reconfiguration kit to remove the ‘F’ lavatory, install an ‘A’ lavatory and take the aircraft from a two-class configuration to an all economy 170Y configuration, including all floor structure, plumbing, service panel and electrical installations. Provided engineering order, LOPA, emergency equipment drawing and FAA form 8110-3 certification.